Critical Path Calculator

List your tasks, durations, and dependencies and get the full critical path method (CPM) analysis — earliest and latest start times, float for every task, the critical chain that sets your end date, and the total project duration.

Task list

Give each task a duration in working days. In Depends on, list the IDs of the tasks that must finish first (comma-separated, e.g. A, C). Leave it blank for starting tasks.

IDTask nameDuration (days)Depends on

Reference

How the critical path method works

CPM finds the longest chain of dependent tasks in your project. That chain — the critical path — determines the minimum project duration. Everything else has float.

What the numbers mean

ES / EFEarliest start and finish, found by a forward pass: a task can start as soon as all of its predecessors are done.
LS / LFLatest start and finish that still hit the project end date, found by a backward pass from the final task.
FloatLS − ES. The number of days a task can slip before it delays the project. Zero float = critical.
Critical pathThe chain of zero-float tasks from start to finish. Its length equals the total project duration.

Using it well

  • Estimate durations in working days and keep them honest — padding hides the real critical path.
  • Watch near-critical tasks (1–3 days of float). Small slips can flip the critical path to a different chain.
  • Crash or fast-track only critical tasks — shortening anything else spends money without moving the end date.
  • Re-run the analysis whenever scope or dependencies change; the critical path moves more often than teams expect.
  • This model assumes finish-to-start dependencies with no lead/lag — the standard planning baseline.